
Follow us
Services
Planning, investigative and feasibility studies for streets, utility systems, and site and residential development reviews, including:. Preparation of preliminary designs and construction documents for renovation of existing and/or new construction of proposed infrastructure, streets, and site developments including:.
In order to provide guidance to address the city of Gold Beach's future water needs, a water master plan was developed to be used for systematic upgrades to the City's water system. Included was a water management and conservation plan. As part of the study, the current water distribution system, demand patterns, and system performance were evaluated with WaterCAD with respect to critical service standards, and emphasis on selected vital or high fire flow areas within the City.
Our experienced professional surveyors and field support personnel excel in their fields and methods of surveying technology including robotic total stations, GPS and digital levels. By using state of the art equipment, this reduces crew size requirements while increasing productivity and vastly broadening our firm's capabilities.
The storm water system inventory and analysis provides data for planning, prioritizing, and designing storm water infrastructure for the City of Coos Bay. The existing system was field surface verified and assessed for condition and capacity. The anticipated impact of EPA Phase II requirements for MS4 and future regulations was presented.
Reviews

Be the first to review Dyer Partnership - Steve Major Pe.
Write a Review